Live Program Data · Updated Daily
0mi

Miles Ridden This Year

0lbs

Pounds of CO₂ Kept Out of the Air

0

Active Riders This Month

Every mile started with someone like you.

Fund a Mile
Bicycle mechanic in bright workshop truing a wheel, tools hanging on pegboard behind them
01 / LEDGER
Maintenance Hub · Monthly Cost

Every bike earns its place on the road.

Our mechanics true wheels, adjust brakes, and replace worn components on a fixed schedule — not when something breaks. Preventive maintenance keeps bikes safe and keeps them out of the repair queue.

Cost BreakdownPer Unit / Month

Wheel truing & spoke tension

Avg. once per 6 weeks per bike

$4.20

Brake pad replacement (set)

Every 90 days in wet season

$3.80

Chain lubrication & drivetrain

Bi-weekly service

$2.10

Tire pressure & puncture check

Every dock return scan

$1.50

Solar dock charging port test

Monthly diagnostic

$1.40

Labor allocation (per bike)

0.8 hrs mechanic time

$12.00
Total: 1 bike, road-ready, 1 month$25.00

Keep the momentum going

Your contribution keeps a bike on the road.

Station Installation · Per Dock Point

One dock point opens a new route.

A new dock point isn't just hardware — it's a permit, a concrete pad, a solar panel, an NFC reader, and a neighborhood that can finally close the gap. We publish every line item before we break ground.

Cost BreakdownPer Unit / Month

Concrete pad & site preparation

Includes curb cut compliance

$18.00

Solar canopy & panel unit

40W panel, 10-year warranty

$22.00

NFC dock hardware & install

Tap-to-unlock reader + mount

$19.00

City permit & inspection fee

Varies by district

$8.00

Signage & wayfinding markers

Bilingual, ADA compliant

$4.50

Network connectivity setup

LTE module + first-year SIM

$3.50
Total: 1 new dock point, fully operational$75.00
City map pinned to a wall showing proposed bike station locations in underserved neighborhoods
02 / LEDGER
Who Depends on This

Real people. Real stakes.

$328/mo saved
"I sold my second car eighteen months ago. Pedal is the reason that was possible. My commute costs went from $340 a month to $12."
Portrait of Denise Okafor

Denise Okafor

Registered Nurse, East General Hospital

+22% foot traffic
"Foot traffic to my bakery went up 22% after the station opened on our block. Commuters stop in. It's that simple."
Portrait of Rafael Moreno

Rafael Moreno

Owner, Moreno Panadería

4.2T CO₂ offset
"We measured 4.2 metric tons of CO₂ offset from Pedal riders in Q4 alone. That's a real number in our climate budget."
Portrait of Councilmember Priya Anand

Councilmember Priya Anand

District 7 City Council

Keep the momentum going

Your contribution keeps a bike on the road.

Residential street in an underserved neighborhood with no bike infrastructure, residents walking long distances
03 / LEDGER
Transit Desert · Expansion Priority

Four neighborhoods have zero stations.

These are not abstract dots on a map. They're zip codes where residents walk 1.2 miles to the nearest dock, where car ownership rates are 40% below the city average, and where a station changes the daily math of getting to work.

Cost BreakdownPer Unit / Month

Full station (6 dock points)

Covers all hardware & install

$450

Initial bike allocation (8 bikes)

Road-ready, first 6 months

$480

Community outreach & training

Onboarding for 200 residents

$60

12-month maintenance reserve

$25/bike × 8 bikes × 12 mo

$240

Operations & monitoring (yr 1)

Remote diagnostics + staffing

$120
Total: 1 full station in a transit desert$1,350
Expansion Planning

See Where Your
Station Goes.

Four neighborhoods have zero stations today. Riders there walk over a mile to the nearest dock. Vote for which community gets the next expansion — we build in priority order.

1,847 votes cast · Next station breaks ground Q3 2026

Downtown Hub

Active station

Midtown

Active station

South End

Active station

Eastside Flats

Proposed site

North Park

Proposed site

Suncrest

Proposed site

Riverside

Proposed site

Active
Proposed

23

Active Stations

Vote for the next neighborhood

Select one area. We'll notify you when ground breaks.